{"id":207,"date":"2023-06-05T03:17:06","date_gmt":"2023-06-05T03:17:06","guid":{"rendered":"https:\/\/www2.serenitypoolsandspas.net\/?page_id=207"},"modified":"2023-09-22T21:46:06","modified_gmt":"2023-09-22T21:46:06","slug":"our-construction-process","status":"publish","type":"page","link":"https:\/\/www.serenitypoolsandspas.net\/?page_id=207","title":{"rendered":"OUR CONSTRUCTION PROCESS"},"content":{"rendered":"\n<section id=\"section-7e4ed866-9e85-4825-88b2-59c5633b7e29\" class=\"wp-block-gutentor-image-slider gutentor-section gutentor-image-slider imageSlider-template1\"><div class=\"gutentor-grid-item-wrap wow animated slideInUp\" data-wow-animation=\"slideInUp\" data-wow-duration=\"3s\"><div class=\"gutentor-slider-wrapper\" data-dots=\"false\" data-arrows=\"false\" data-infinite=\"false\" data-nextarrow=\"fas fa-angle-right\" data-prevarrow=\"fas fa-angle-left\" data-autoplay=\"false\" data-autoplayspeed=\"2000\" data-fade=\"false\" data-speed=\"300\"><div class=\"gutentor-slider-item\"><div class=\"gutentor-single-item gutentor-single-item-0\"><div class=\"gutentor-single-item-wrap\"><div class=\"gutentor-single-item-image-box\"><div class=\"gutentor-bg-image\"><div class=\"overlay\"><\/div><\/div><\/div><div class=\"gutentor-single-item-content\"><div class=\"grid-container\"><div class=\"slider-caption text-left\"><h3 class=\"gutentor-single-item-title\">Serenity Pools is an innovative company that sets high standards, using state-of-the-art equipment for hydraulic and structural engineering.<br><\/h3><p class=\"gutentor-single-item-desc\"><br>We begin the pool-building process by working with our clients to design a pool that meets all of the clients&#8217; expectations. We go over every detail to ensure customer satisfaction.<br><br>Once the client is confident of the design, Serenity Pools will begin construction with the excavation and installation of the pool site. For this step, we dig the pool site, install rebar (reinforcing steel bars for concrete support), install the plumbing and electrical wiring required for the pool, and pour the concrete. The next step is to allow enough time for the concrete to cure, then we install the decking, tile, and other essential pool features.<br><br>The final step after pool construction is to test the pool to make sure all equipment is working properly and there are no defects in the pool&#8217;s construction. After a complete inspection by the owner and general contractor at Serenity Pools, we fill the pool with water and prepare the pool for the client to enjoy.<\/p><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section>\n\n\n\n<p><\/p>\n\n\n\n<section id=\"551339\" class=\"section-551339 gutentor-module gutentor-module-accordion gutentor-module-accordion-enable-toggle\"><div class=\"grid-container\">\n<div id=\"7071c5\" class=\"wp-block-gutentor-m6-item section-7071c5 gutentor-module gutentor-module-accordion-item gutentor-module-accordion-active\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon gutentor-module-accordion-icon-active\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 1 \u2013 Initial Consultation<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g203648\" class=\"wp-block-gutentor-e0 section-g203648 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">During the initial consultation, you and your design consultant will discuss the options and features available for your backyard oasis. You will be shown various photos, slide shows, videos, samples, and pools during construction and after completion in order to give you a full understanding of what the finished product will look like. They will also give you step by step knowledge regarding our procedures and products. Please bring a survey\/site plan of your property to speed up the process.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"743fe0\" class=\"wp-block-gutentor-m6-item section-743fe0 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 2 \u2013 Site Visit<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gc17ca4\" class=\"wp-block-gutentor-e0 section-gc17ca4 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">A site assessment of your property will be done by your design consultant. They will come out to your property in order to take pictures and measurements necessary for completing your 3D design. During this assessment, they will determine where the equipment will be located, how we will access the backyard with our equipment and if there is anything in the way of construction.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"4f0234\" class=\"wp-block-gutentor-m6-item section-4f0234 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 3 \u2013 3D Design<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g8e7998\" class=\"wp-block-gutentor-e0 section-g8e7998 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Using the information you provided during your initial meeting along with the pictures and measurements of your property, your design consultant will put together a detailed computerized rendering of your dream pool using the latest 3D technology.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"de532b\" class=\"wp-block-gutentor-m6-item section-de532b gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 4 \u2013 Meet &amp; Review Your Design and Quote<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gcabf38\" class=\"wp-block-gutentor-e0 section-gcabf38 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Once you are completely satisfied with the design of your backyard oasis, an accurate quote will be put together. At this time, your design consultant will set up an appointment to go over the quote details with you.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"3328b7\" class=\"wp-block-gutentor-m6-item section-3328b7 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 5 \u2013 Sign &amp; Pick Colors<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g0784d0\" class=\"wp-block-gutentor-e0 section-g0784d0 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">After all the details and numbers have been discussed, it is time to sign the agreement, permit paperwork, and pick colors\/materials for your new Pool! Your designer will assist you with your color selections and paperwork.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"e47120\" class=\"wp-block-gutentor-m6-item section-e47120 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 6 \u2013 Permitting<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gbfde68\" class=\"wp-block-gutentor-e0 section-gbfde68 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Serenity Pools handles the permitting for you! Your permit paperwork is submitted to the County office for permit review. During this time, it is the responsibility of the homeowner<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"5aaa0e\" class=\"wp-block-gutentor-m6-item section-5aaa0e gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 7 \u2013 Irrigation and Landscaping<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g2d3ff6\" class=\"wp-block-gutentor-e0 section-g2d3ff6 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Prior to the start of construction, it is your responsibility to have your irrigation capped, all landscaping removed or relocated, and any other items in the way of the pool moved. We suggest having your irrigation capped immediately after signing your pool agreement. If for any reason these items are not taken care of prior to permitting approval, Serenity Pools will not start the build until they have the proper clearance on the property.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"562594\" class=\"wp-block-gutentor-m6-item section-562594 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 8 \u2013 Pre-site\/Sod Removal<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g57768b\" class=\"wp-block-gutentor-e0 section-g57768b gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">One of our construction managers will come out and pre-site your property. The existing sod will be scraped off from the proposed pool area and hauled away. This process is done to ensure we have true elevations.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"e37375\" class=\"wp-block-gutentor-m6-item section-e37375 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 9 \u2013 Pool Layout<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gd8b0ed\" class=\"wp-block-gutentor-e0 section-gd8b0ed gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Our in-house layout crew will layout the perimeter of your pool with stakes, wood forms, and string lines. This step is done in preparation for digging the pool. It is very important and must be done accurately which is why Serenity Pools uses our own employees in order to ensure accuracy.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"56cb5b\" class=\"wp-block-gutentor-m6-item section-56cb5b gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 10 \u2013 Dig<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-ga2294a\" class=\"wp-block-gutentor-e0 section-ga2294a gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Once the pool is staked out, our crew will begin digging your new pool. Our standard pools are 3\u2019 \u2013 5\u2019 deep. A pool that is 5\u2019 at its deepest point will be dug to approximately 6\u2019 6\u201d in order to properly stabilize the shell, install your sump system line, and fit your channel drain correctly. Properly stabilizing the shell and installing a sump line is essential. In Florida, we are surrounded by water. Groundwater can cause issues with your new pool if it is not handled correctly. When choosing a pool builder to be sure to ask if they take these precautionary steps and ask them what the benefits are.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"277a33\" class=\"wp-block-gutentor-m6-item section-277a33 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 11 \u2013 Form<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-ge015bb\" class=\"wp-block-gutentor-e0 section-ge015bb gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">This is when the elevation of your new pool is set. The step is very important and will affect every step along the way if done incorrectly. Serenity Pool\u2019s in-house crew will be onsite with their lasers triple checking everything to make sure the elevation is set properly and is level. Stabilization rock will also be installed during this step.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"364f58\" class=\"wp-block-gutentor-m6-item section-364f58 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 12 \u2013 Steel<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gb601b5\" class=\"wp-block-gutentor-e0 section-gb601b5 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Our in-house crew preforms this step as well. They will form and lay #3 rebar every 1\u2019 on center throughout your entire pool form. You will also see them begin to pre-plumb.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"b5cc3c\" class=\"wp-block-gutentor-m6-item section-b5cc3c gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 13 \u2013 Shell<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g9703e5\" class=\"wp-block-gutentor-e0 section-g9703e5 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">At this step, you will really start to see the pool take shape. The Gunite concrete is shot through a high-pressure hose for structural strength. Gunite is a concrete blend of sand, cement, and water. It becomes rock hard, forming a thick, solid structure. Keep in mind this is the rough structure of your pool and will be finished off with plaster later in the process. The shell will cure as we do the finished work around the pool.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"19612a\" class=\"wp-block-gutentor-m6-item section-19612a gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 14 \u2013 Strip Shell<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g489f18\" class=\"wp-block-gutentor-e0 section-g489f18 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">All form boards are removed and prep for plumbing is started.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"7311fb\" class=\"wp-block-gutentor-m6-item section-7311fb gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 15 \u2013 Backfill &amp; Compact<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g6ac4d4\" class=\"wp-block-gutentor-e0 section-g6ac4d4 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Once the plumbing is complete, the dirt is backfilled into the trenches to cover any exposed pipes. The soil is then compacted using a heavy jumping jack tamper. The soil must be compacted properly to minimize shifting and settlement issues with your new deck.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"2532ff\" class=\"wp-block-gutentor-m6-item section-2532ff gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 16 \u2013 Plumbing<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gef88c1\" class=\"wp-block-gutentor-e0 section-gef88c1 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">A special TDH engineering is customized for every job. Pipe diameters are determined by calculating flow rates based on water demand including pumps, filters, and water features. Serenity Pools uses a minimum of 2\u201d schedule 40 PVC non-corrosive piping. We dig the plumbing trenches with our mini excavator. We are sure to dig at least 3\u2019 down so your plumbing is protected. The pipes run from your new pool to your new pool equipment and are pressurized to be sure there are no leaks and to pass county inspections.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"69683e\" class=\"wp-block-gutentor-m6-item section-69683e gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 17 \u2013 Tile &amp; Coping<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g20276f\" class=\"wp-block-gutentor-e0 section-g20276f gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">This step is where the artistry comes in. Our in house crew will start by checking if your shell is completely level and will mud up any areas that may need it to ensure accuracy. Water doesn\u2019t lie so ensuring that everything is level is vital. Each piece of coping and tile will be cut and set individually to ensure there<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"3b4f1b\" class=\"wp-block-gutentor-m6-item section-3b4f1b gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 18 \u2013 Footer<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gd712a0\" class=\"wp-block-gutentor-e0 section-gd712a0 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Footings are excavated on the perimeter of the deck to code enforced depths and require specific rebar steel. A code required termite spray is applied to the foundation.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"3d3067\" class=\"wp-block-gutentor-m6-item section-3d3067 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 19 \u2013 Decking options (Concrete, Pavers, &amp; Travertine)<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g6eb657\" class=\"wp-block-gutentor-e0 section-g6eb657 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">We have multiple decking options to choose from. Be sure to ask your design consultant about the materials we offer and the pros and cons of each in order to help you make the best decision for your backyard oasis. Below are some examples of some of the decking types available. Regardless of the deck type you choose, a 2\u201d deco drain is installed between the deck and house for drainage purposes.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"76c688\" class=\"wp-block-gutentor-m6-item section-76c688 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 20 \u2013 Pool Equipment<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g34326e\" class=\"wp-block-gutentor-e0 section-g34326e gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Your new pool equipment will be set on a concrete pad. The pad is oversized to leave enough room for a heat pump whether you install one right away or in the future. All of our equipment is labeled for your convenience. Proper placement for your equipment will be determined by you and your designer.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"57419d\" class=\"wp-block-gutentor-m6-item section-57419d gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 21 \u2013 Screen Enclosure<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gf3ff20\" class=\"wp-block-gutentor-e0 section-gf3ff20 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">The screen enclosure is pre-cut at the factory and delivered in pieces to the job site. It is then assembled using screws to attach it to the deck and walls of the house. A super gutter is also installed on the roof fascia and enclosure in order to capture water and debris. The cage is optional mansard or gable.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"61fdb7\" class=\"wp-block-gutentor-m6-item section-61fdb7 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 22 \u2013 Final Grade<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g86d974\" class=\"wp-block-gutentor-e0 section-g86d974 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Serenity Pools does a one-time grade and rake of the site and access area. The grade is done to county drainage standards. It is the homeowner\u2019s responsibility to have the yard sodded in order to pass the final inspection.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"c17338\" class=\"wp-block-gutentor-m6-item section-c17338 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 23 \u2013 Safety Features<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g10ea1d\" class=\"wp-block-gutentor-e0 section-g10ea1d gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">State code requires installation of either battery-operated alarms or safety fence. Serenity Pools takes responsibility to make sure the safety device you choose is installed properly and passes county inspection. The alarms need to be on all doors and windows exiting from the home to the enclosed pool area or a safety fence can be installed. An inspection by the county is required at this time.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"864ae8\" class=\"wp-block-gutentor-m6-item section-864ae8 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 24 \u2013 Interior Surface<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-gb272ab\" class=\"wp-block-gutentor-e0 section-gb272ab gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">The pool shell is chemically treated, prepped with a waterproofing agent, and cleaned prior to installation of the interior finish. Your step diamonds, step markers, and any mosaics are installed during this step. Serenity offers various color options of PebbleTec finishes as our standard finish. You also have the option to upgrade your interior to a polished finish if that suits your needs. Both options come with a limited lifetime warranty that we back the labor on. Your design consultant will help you choose the color and material from one of the many options available.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"5e9907\" class=\"wp-block-gutentor-m6-item section-5e9907 gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 25 \u2013 Pool Fill &amp; Start Up<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g135409\" class=\"wp-block-gutentor-e0 section-g135409 gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Your new pool will be filled using your garden hose directly from your house or well immediately after the acid wash of the interior finish has been completed. City sewer customers will receive a sewage credit to submit to the water department in order to receive credit on their next bill. A typical pool takes 24 \u2013 30 hours to fill. It is normal for your water to look green for the first few days.<br><br>Serenity Pools has full-time startup employees who will do a \u201csoft start-up\u201d. They will care for the pool for a period of approximately 30 days. Certain chemicals will be added in order to balance the water. Once the pool is ready for salt, our crew will add the initial salt needed to turn your pool over to a saltwater pool.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n\n\n\n<div id=\"836cec\" class=\"wp-block-gutentor-m6-item section-836cec gutentor-module gutentor-module-accordion-item\"><div class=\"gutentor-module-accordion-panel g-a-panel-551339\"><div tabindex=\"0\" class=\"gm-ah-551339 gutentor-module-accordion-item-heading gutentor-module-icon-position-left\"><span class=\"gutentor-module-accordion-panel-handler\" role=\"button\"><span class=\"gutentor-module-accordion-icon\"><i class=\"gm-aio-551339 gutentor-module-accordion-icon-open fas fa-angle-down\"><\/i><i class=\"gm-aic-551339 gutentor-module-accordion-icon-close fas fa-angle-up\"><\/i><\/span><span class=\"gutentor-module-accordion-panel-handler-label\">Step 26 \u2013 Pool School<\/span><\/span><\/div><div class=\"gm-ab-551339 gutentor-module-accordion-body\">\n<div id=\"section-g129d4a\" class=\"wp-block-gutentor-e0 section-g129d4a gutentor-element gutentor-element-advanced-text\"><div class=\"gutentor-text-wrap\"><p class=\"gutentor-text\">Now it is time to teach you how to care for and maintain your beautiful new pool. A member of<br>our service staff will schedule an appointment with you at your property to explain the process of<br>operating your new pool.<\/p><\/div><\/div>\n<\/div><\/div><\/div>\n<\/div><\/section>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-207","page","type-page","status-publish","hentry"],"featured_media_urls":[],"_links":{"self":[{"href":"https:\/\/www.serenitypoolsandspas.net\/index.php?rest_route=\/wp\/v2\/pages\/207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.serenitypoolsandspas.net\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.serenitypoolsandspas.net\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.serenitypoolsandspas.net\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.serenitypoolsandspas.net\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=207"}],"version-history":[{"count":29,"href":"https:\/\/www.serenitypoolsandspas.net\/index.php?rest_route=\/wp\/v2\/pages\/207\/revisions"}],"predecessor-version":[{"id":746,"href":"https:\/\/www.serenitypoolsandspas.net\/index.php?rest_route=\/wp\/v2\/pages\/207\/revisions\/746"}],"wp:attachment":[{"href":"https:\/\/www.serenitypoolsandspas.net\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}